Journal of Construction Engineering and Management
May 30, 2015
Title
Grouting Time & Concrete Crack
Abstract
In the working site, the concrete surface is always spitted with many cracks by the steams, and the primary reason is the starting and terminal time of the actual grouting. If the grouting can be controlled less than 3 hours, the grouting shall be started on the A.M. 9:00; if the grouting cannot be controlled less than 3 hours, the grouting shall be started on the P.M. 3:00. Once the grouting is completing in the morning, the concrete surface should have the blanket of the canvas with the mold discharging agent.
Keywords: Grouting, Concrete Crack
May 30, 2015
Title
Grouting Time & Concrete Crack
Abstract
In the working site, the concrete surface is always spitted with many cracks by the steams, and the primary reason is the starting and terminal time of the actual grouting. If the grouting can be controlled less than 3 hours, the grouting shall be started on the A.M. 9:00; if the grouting cannot be controlled less than 3 hours, the grouting shall be started on the P.M. 3:00. Once the grouting is completing in the morning, the concrete surface should have the blanket of the canvas with the mold discharging agent.
Keywords: Grouting, Concrete Crack